Ball Valve Use Installation And Maintenance

Ningbo Fenfa Valve Co.,Ltd | Updated: Sep 07, 2017

Ball valve is a pipe used to cut off, the distribution of changes in the direction of the media to change the device, in use only need to rotate 90 degrees of operation and a small turning torque can be closed tight. What do you need to pay attention to when using a ball valve?

The use of ball valves

1, must first identify the ball valve, the downstream pipeline has been unloading pressure, in order to disassemble the decomposition operation.

2, non-metallic parts should be immediately removed from the cleaning agent, not a long time soaking.

3, the assembly of the flange on the flange must be symmetrical, step by step, even tighten.

4, cleaning agents should be with the ball in the rubber parts, plastic parts, metal parts and working medium (such as gas) are compatible. When the working medium is a gas, the metal parts can be cleaned with gasoline (GB484-89). Non-metallic parts are washed with pure water or alcohol.

5, the decomposition of each single ball valve parts can be washed with immersion method. Metal parts that are left with undecomposed nonmetallic parts can be scrubbed with a clean, fine, dipped silk cloth (to prevent the fibers from adhering to the part). Cleaning to remove all the adhesion of the wall of grease, dirt, plastic, dust and so on.

6, ball valve decomposition and re-assembly must be careful to prevent damage to the sealing surface parts, especially non-metallic parts, remove the O-ring should use special tools.

7, after cleaning to be washed wall cleaning agent volatile (can be used without cleaning detergent cloth) for assembly, but not for a long time to shelve, otherwise it will rust, dust pollution.

9, use grease lubrication. Grease should be compatible with ball valve metal materials, rubber parts, plastic parts and working medium. When the working medium is a gas, use special gas such as special 221. Apply a thin layer of grease to the surface of the seal mounting groove, apply a thin layer of grease to the rubber seal, apply a thin layer of grease to the sealing surface and friction surface of the valve stem.

10, the assembly should not allow metal debris, fiber, grease (except for the provisions of the use of) dust and other impurities, foreign body pollution, adhesion or stay in the surface of the parts or into the cavity.

Ball valve installation

Preparation of ball valve before installation

1, before and after the pipeline should be coaxial, two flange sealing surface should be parallel. Pipes should be able to withstand the weight of the ball valve, otherwise the pipe must be equipped with appropriate support.

2, the valve before and after the pipeline clean, remove the pipeline of oil, welding slag and all other impurities.

3, check the ball valve logo, identify the ball valve intact. The valve fully open all closed several times confirmed that its work is normal.

4, remove the ball valve at both ends of the connection flange on the protection.

5, check the valve hole to clear the dirt may be, and then clean the valve hole. Even if only small particles of foreign matter between the valve seat and the ball may damage the valve seat sealing surface.

Ball valve installation

1, the ball valve installed on the pipeline, any one end of the ball can be installed in the upstream side. The ball valve driven by the handle can be mounted on any position on the pipe. But with a gearbox or pneumatic ball valve should be installed upright, that is installed in the horizontal pipe, and the drive device in the pipeline above.

2, the valve flange and the pipeline between the flange design requirements installed on the gasket.

3, the flange on the bolt to be symmetrical, successive, uniform tightening.

4, connect the pneumatic line (when using the pneumatic drive).

Check the ball after installation

1, the operation of the drive open and close the ball several times, should be flexible without stagnation, confirmed that its work is normal.

2, according to the pipeline design requirements of the pipe and the ball valve between the flange surface sealing performance inspection.

Ball valve maintenance

1, must first identify the ball valve, the downstream pipeline has been unloading pressure, in order to disassemble the decomposition operation.

2, decomposition and re-assembly must be careful to prevent damage to the sealing surface parts, especially non-metallic parts, remove the O-ring should use special tools.

3, the assembly of the flange on the flange must be symmetrical, step by step, even tighten.

4, cleaning agents should be with the ball in the rubber parts, plastic parts, metal parts and working medium (such as gas) are compatible. When the working medium is a gas, the metal parts can be cleaned with gasoline. Non-metallic parts are washed with pure water or alcohol.

5, the decomposition of a single part can be washed with immersion method. Metal parts that are left with undecomposed nonmetallic parts can be scrubbed with a clean, fine, dipped silk cloth (to prevent the fibers from adhering to the part). Cleaning to remove all the adhesion of the wall of grease, dirt, plastic, dust and so on.

6, non-metallic parts should be immediately removed from the cleaning agent, not a long time soaking.

7, after cleaning to be washed wall cleaning agent volatile (can be used without cleaning detergent cloth) for assembly, but not for a long time to shelve, otherwise it will rust, dust pollution.

8, the new parts need to be cleaned before assembly.

9, use grease lubrication. Grease should be compatible with ball valve metal materials, rubber parts, plastic parts and working medium. When the working medium is a gas, use special gas such as special 221. Apply a thin layer of grease to the surface of the seal mounting groove, apply a thin layer of grease to the rubber seal, apply a thin layer of grease to the sealing surface and friction surface of the valve stem.

10, the assembly should not allow metal debris, fiber, grease (except for the provisions of the use of) dust and other impurities, foreign body pollution, adhesion or stay in the surface of the parts or into the cavity.

Ball valve maintenance and maintenance precautions

Want to make the ball valve has a long service life and maintenance-free period, in addition to the normal working conditions, to maintain a harmonious temperature / pressure ratio, and reasonable corrosion data, will also rely on the following several factors:

1. In the ball valve closed state, the valve body is still inside the pressurized fluid.

2. Before servicing the ball valve, lift the line pressure and keep the valve in the open position.

3. Disconnect the power supply or air supply before repairing the ball valve.

4. Disassemble the actuator from the stand before servicing.

5. must first identify the ball valve, the downstream pipeline has been unloading pressure, in order to disassemble the decomposition operation

6. Decomposition and reassembly must be careful to prevent damage to the sealing surface of parts, especially non-metallic parts, remove the O-ring should use special tools

7. Ball valve assembly flange on the bolts must be symmetrical, step by step, even tighten.

8. The cleaning agent should be compatible with the rubber parts, plastic parts, metal parts and working medium (such as gas) in the ball valve. When the working medium is a gas, the metal parts can be cleaned with gasoline. Non-metallic parts are washed with pure water or alcohol

9. Separate single parts can be washed with immersion. Metal parts that are left with undecomposed nonmetallic parts can be scrubbed with a clean, fine, dipped silk cloth (to prevent the fibers from adhering to the part). Cleaning to remove all the adhesion of the wall of grease, dirt, plastic, dust and so on

10. Non-metallic parts should be removed immediately after cleaning from the cleaning agent, not a long time soaking

11. After cleaning to be washed wall cleaning agent volatile (can be used without cleaning detergent cloth) for assembly, but not for a long time to shelve, otherwise it will rust, dust pollution

12. New parts need to be cleaned before assembly

13. Use grease to lubricate. Grease should be compatible with ball valve metal materials, rubber parts, plastic parts and working medium. When the working medium is a gas, use special gas such as special 221. Apply a thin layer of grease to the surface of the seal mounting groove, apply a thin layer of grease to the rubber seal, apply a thin layer of grease to the sealing surface of the stem and the friction surface

14. Do not allow metal debris, fiber, grease (except for the use of) dust and other impurities, foreign bodies and other pollution, adhesion or stay on the surface of the parts or into the cavity.

1), the filler was re-locked if the filler at the occurrence of micro-leakage, need to lock the stem nut. Note: Do not lock too tight, usually lock 1/4 turn to 1 turn, the leak will stop.

2), replace the seat and seal.

A), disassembly

So that the valve in a half open position, rinse, remove the valve body may exist inside and outside the dangerous substances. Close the ball valve, remove the connecting bolts and nuts on both sides of the flange, and then remove the valve completely from the line. Remove the drive in sequence - actuators, connecting brackets, loose washers, stem nuts, butterfly shrapnel, ginnam, wear plate, stem packing. Remove the cover and connect the nut and nut to separate the bonnet from the valve body and remove the bonnet gasket. Make sure the ball valve is in the "OFF" position, which can be easily removed from the valve body, and then remove the seat. Slide the valve stem down the hole in the valve body until it is completely removed, then remove the O-ring and stem underfill.

B), reassembled

Cleaning and inspection of the removal of parts, it is strongly recommended to use spare parts package replacement valve seat and valve cover gasket and other seals. Assemble in the reverse order of disassembly. With the specified torque, cross-locking flange bolts. Use the specified torque to lock the stem nut. After installing the actuator, enter the corresponding signal by rotating the stem to drive the spool to rotate the valve to the open and closed positions. If possible, perform pressure seal testing and performance testing on the valve according to the relevant standards before returning the pipe.